| Jumping Pillow InstallationInstallation Tips
■ Do NOT dig your trench before we get there! ■ Do NOT mark-out and dig the trench until the installation teams arrives. ■ Marking the pillow out can only be done with the pillow in place. ■ Prepare the ground by removing stones etc. ■ Level the surface as best as possible. First Jump The pillow is normally ready to jump on immediately, however optimum inflation relies on the sealing of the trench and the settling of the in trench components, this can take from 1 to 6 days. Please inform us if your site is elevated 1500ft or more above sea level so that the correct pump and blower unit is installed. Drainage Before backfilling of the trench takes place you may want to consider running 4" flexible drainage pipe around the bottom of the trench. Although problems with drainage are not common, it can occur. Please talk to us about drainage at the time of your order.
Removing sharp rocks or objects and leveling the surface as best a possible will make for a a better installation.
Digging a straight trench and avoiding cave-ins is important to the installation process.
Once all the hard work is done the fun begins.
|